Msc ee3.mms Multimedia Systems * - Terry Windeatt
1) DELIVERABLES
Deliverables and Deadlines
Main deliverables:
For deliverable deadlines see:
deadlines.htm
2) FURTHER DETAILS OF PROGRAMMING
ASSIGNMENT AND SEMINAR
Introduction to SRGP week 2
NOTE: To run SRGP it is assumed that you have a
terminal window on a machine running LINUX
(for
solaris go to \examples and \srgp directory and modify the Makefile as noted at
line 20 in the file and type ‘cd ..’ followed by ‘make’ to recompile)
srgpintro.pdf srgpintro.htm srgpintro.doc (word2000)
progassign.pdf progassign.htm progassign.doc (word2000)
SEMINAR SCHEDULE NOTE: An overhead
projector and PC projector is available (you supply PC), so please prepare a couple of overheads. If you use PC make sure it works with the projector at the beginning of the session.
The time for
the presentation is 20 minutes. YOU WILL BE STOPPED AFTER 22 MINUTES